+44 (0)20 7592 1122
enquiries@williamjmarshall.co.uk
Enter the email address and we'll send a link of this page to that address.
Email*:
Or share on social media.
This project involved damage to a Victorian house, allegedly caused by the action of roots of trees owned by the Local Authority in the nearby highway.
Read more
This project involved the release of water from two dams in southern Ireland resulting in flooding of property downstream.
This project involved the investigation of water penetration through the roof and defects in the new faience tiling of an extension to a major listed building.
This project involved the effects of nearby pipeline construction works on the ruins of a medieval bridge located on part of the Silk Road in western Azerbaijan.
This project involved the structural assessment of a new stone balcony.
This project involved the inspection and analysis of a temporary multi-propped sheet pile retaining wall.
This project involved the inspection and geotechnical analysis of a multi-bay portal frame industrial warehouse adjacent to a river cutting, supported on trench fill and pad foundations.
This project involved the construction of an underpass in the Midlands comprising 4No bridge abutments formed of bored cast-in-situ pile retaining walls.
This project involved a supermarket building which had been constructed on a bridge structure over a main-line railway in the Midlands.
This project involved the design and construction of a new anaerobic digestion plant in the Midlands.