Anaerobic Digestion Plant – England

Client: Building Owner/Operator

This project involved the design and construction of a new anaerobic digestion plant in the Midlands.  A number of years after the plant had been built significant water ingress started occurring into the basement.  The Building Owner/Operator of the plant submitted a claim for the losses incurred which was disputed by the Design and Build Contractor.

WJM&P were engaged by the Building Owner/Operator to advise on the cause of and responsibility for the failure, and the likely scope of remedial works.  Our investigation included analysis of the contract documents, review of the investigations by others, and an assessment of the adequacy of the reinforced concrete basement retaining walls and slab against the relevant standards.

Our expert report on the technical issues was exchanged with the Design and Build Contractor, and the Building Owner/Operator’s claim was settled by negotiation prior to formal dispute resolution.

  • Get in touch

    Get in touch with us

    Title*:

    First name*:

    Last name*:

    Email*:

    Telephone*:

    Enquiry*:

    * Mandatory fields

    By completing this form, you agree to
    us keeping your details on our system (please refer to our Privacy Policy for further details).

  • Share

    Share this page with a friend

    Enter the email address and we'll send a link to this page to that address.

    Email*:

case studies

Engineering Case Studies